ISJ Theoretical & Applied Science

 

 

Information about the scientific conferences and journal

Schedule of conferences

Submit a report to the conference

Requirements to the article

Section

Indexing

Journal archive

Tracing of postal items

The organizing Committee of Conference

Editorial Board

 

 

www.T-Science.org       p-ISSN 2308-4944 (print)       e-ISSN 2409-0085 (online)
SOI: 1.1/TAS         DOI: 10.15863/TAS

Journal Archive

ISJ Theoretical & Applied Science 02(34) 2016

ISPC Technology and Innovation, Philadelphia, USA

* Scientific Article * Impact Factor 6.630


Shalkar EZ, Kupesheva AK, Myrzaliev BS

OPTIMIZATION OF THE ECONOMIC INDICATORS BUILDING OBJECT IN THE PREPARATION OF THE CALENDAR SCHEDULE OF CONSTRUCTION RISK ACCORDING TO SIMPLIFIED FORMULA OF MONTE CARLO METHOD.

Full Article: PDF

Scientific Object Identifier: http://s-o-i.org/1.1/TAS-02-34-3

DOI: http://dx.doi.org/10.15863/TAS.2016.02.34.3

Language: Russian

Citation: Shalkar EZ, Kupesheva AK, Myrzaliev BS (2016) OPTIMIZATION OF THE ECONOMIC INDICATORS BUILDING OBJECT IN THE PREPARATION OF THE CALENDAR SCHEDULE OF CONSTRUCTION RISK ACCORDING TO SIMPLIFIED FORMULA OF MONTE CARLO METHOD. ISJ Theoretical & Applied Science, 02 (34): 21-28. Soi: http://s-o-i.org/1.1/TAS-02-34-3 Doi: http://dx.doi.org/10.15863/TAS.2016.02.34.3

Pages: 21-28

Published: 29.02.2016

Abstract: This article is dedicated to economically sound phenomenon, the best known and characterized as risks during construction that are of particular relevance through impact on scheduling, as well as podpravka timetable data risk according to the simplified formula in accordance with the Monte Carlo method, which, in turn, has an impact on the estimated cost of construction as a whole.

Key words: schedule, weight importance, crisis, innovation, investment, risk, range, efficiency analysis, estimated cost, optimization.


 

 

 

 

 

 