Citation: Shalkar EZ, Kupesheva AK, Myrzaliev BS (2016) OPTIMIZATION OF THE ECONOMIC INDICATORS BUILDING OBJECT IN THE PREPARATION OF THE CALENDAR SCHEDULE OF CONSTRUCTION RISK ACCORDING TO SIMPLIFIED FORMULA OF MONTE CARLO METHOD. ISJ Theoretical & Applied Science, 02 (34): 21-28. Soi: http://s-o-i.org/1.1/TAS-02-34-3 Doi: http://dx.doi.org/10.15863/TAS.2016.02.34.3 |
Pages: 21-28
Published: 29.02.2016
Abstract: This article is dedicated to economically sound phenomenon, the best known and characterized as risks during construction that are of particular relevance through impact on scheduling, as well as podpravka timetable data risk according to the simplified formula in accordance with the Monte Carlo method, which, in turn, has an impact on the estimated cost of construction as a whole.
Key words: schedule, weight importance, crisis, innovation, investment, risk, range, efficiency analysis, estimated cost, optimization.
|