Full Article: PDF
Scientific Object Identifier: http://s-o-i.org/1.1/TAS-08-112-21
DOI: https://dx.doi.org/10.15863/TAS.2022.08.112.21
Language: English
Citation: Deryaev, A. R. (2022). Selection of the design of production wells for the development of multi-layer deposits by dual completion operation. ISJ Theoretical & Applied Science, 08 (112), 257-261. Soi: http://s-o-i.org/1.1/TAS-08-112-21 Doi: https://dx.doi.org/10.15863/TAS.2022.08.112.21 |
Pages: 257-261
Published: 30.08.2022
Abstract: The article considers the choice of an operational well design for the development of multi-layer deposits by simultaneous separate operation. Based on the parameters of reservoir pressures according to the calculations carried out, the corresponding depths for well №200, the values of the equivalents of reservoir pressure gradients were obtained. The developed design of the well is effective for the development of wells by the method of dual completion (DC) with two elevators by pumping and compressor pipes. This work can be applied to drilling operations at multi-layer deposits in order to accelerate the development of deposits.
Key words: hydraulic fracturing, well profile, regulations, combined schedule, intermediate column, parallel elevator, rock strength.
|