Full Article: PDF
Scientific Object Identifier: http://s-o-i.org/1.1/TAS-10-114-18
DOI: https://dx.doi.org/10.15863/TAS.2022.10.114.18
Language: English
Citation: Deryaev, A. R. (2022). Calculation of gas lift lifts at the Altyguyi field. ISJ Theoretical & Applied Science, 10 (114), 101-105. Soi: http://s-o-i.org/1.1/TAS-10-114-18 Doi: https://dx.doi.org/10.15863/TAS.2022.10.114.18 |
Pages: 101-105
Published: 30.10.2022
Abstract: The article presents calculations for a periodic gas lift, in relation to the operating conditions of the Altyguyi field, where it is recommended to equip wells with a single-row replacement chamber with a packer and a check valve installed in the lower part of the tubing. The method of designing gas lift lifts is presented. This technique includes the arrangement of starting and working valves in accordance with standard ones, taking into account the properties of reservoir fluids and projected well flow rates. Based on the results of the calculations carried out, the justification for the dual completion (DC) in the wells of the Altyguyi field was carried out.
Key words: Filter opening, oil density, liquid extraction, gravity, liquid lifting height, specific flow rate, gas lift valve, reservoir fluid.
|